Cornerstone Project: 2007-2015 20ft container being packed with boxes of tools & equipment – 2007Hospital bed being dismantled ready for shipping to UgandaSecond 20ft shipping container being packed with equipment and machineryTwo 20ft fully packed shipping containers ready for transport: South AustraliaPacked container being loaded onto transport in South Australia ready for shipment to Uganda20ft shipping container from Australia ready for unloading “on-site” in KitgumUnloading 20ft shipping container using lifting jacks from AustraliaWorkmen destroying termite mound during clearing of the propertyWorkmen removing one of many tree stumps, clearing the propertyWorkmen hand slashing the property in preparation for building constructionWater bore and hand pump December 2007Completed galvanised “Chain-Link” security fence around propertyWorkmen installing Security FenceCompleted double gates, front entry to propertyWelding trusses for roof structure over shipping containersInstalling roof structure purlins and diagonal bracingAssembly of pre-fabricated temporary staff accommodationInstalling roof structure purlins and diagonal bracingRoofing sheets being installedRoofing sheets installed and hedging shrubs plantedCompleted front “in-fill” of roof structure over containers and temporary accommodationBanana plantation & water boreRegular maintenance of the property using slasher and tractorLocal craftsmen constructing bamboo roof structure of “Tukul” (grass roofed home)Local Acholi woman bringing bundle of grass (for roof) to the work-siteCompleted grass roof of traditional “Tukul”Masons (bricklayers) constructing “Tukul” wallsCompleted traditional Acholi “Tukul” November 2009Fabrication Workshop: Workmen fitting side rails to structural postsLifting roof truss into position with tractor and special “jib”Roof structural steelwork completed: ready for roofing sheetsInstalling roofing sheetsStaff skills training: installing door cladding using air operated pop-rivet gunStaff skills training: mixing concrete with petrol engine mixerCompleted Fabrication Workshop StructureFabrication Workshop: setting up formwork & reinforcing mesh for concrete floorPouring / trowelling off reinforced concrete floorCompleted second segment of reinforced concrete workshop floorWater Bore Maintenance: removing corroded pipe workCorroded water bore “foot valve”Re-assembling water bore with new “foot valve”